Accueil Blog News & realization Furnace leads & converters – SCCM ALP
Retour

Furnace leads & converters – SCCM ALP

Image for Furnace leads & converters – SCCM ALP

The converter hood is placed just above the converter or retort containing the feedstock to be treated and it ensures the capture of the fumes generated by the process.

The design of a converter hood must take into account :

  • The geometrical constraints for the installation of this auxiliary equipment (oxygen lance, sampling, additions feed chutes)
  • The multiple stresses to which the cooled elements are exposed (very high thermal loads, erosion-corrosion phenomena, etc.)
  • Reliability and safety of use

 

SCCM ALP Achievements

 

APERAM


Product: Converter hood AOD
Issue: Desire for new installations
Solution: New installations that met the client’s expectations.
Applications: Steel industry

 

ARCELORMITTAL


Product: Converter low hood LET
Issue: Reliability and increased service life
Solution: Transition from a double-shell design to a tubular design with an adapted water circuit
Applications: Steel industry

 

ARCELORMITTAL


Product: Converter top hood LET
Issue: Reliability and increased service life
Solution: Transition from a double-shell design to a tubular design with an adapted water circuit
Applications: Steel indsutry

Article précédent Article suivant